Recent Projects
The Projex Partners team have been involved in the management and execution of many engineering projects across Australia. These projects include road and highway engineering, municipal infrastructure, urban development, hydrology and hydraulics, structural engineering, transport planning and traffic engineering.
We are proud to have been a part of the following exciting projects:
Casuarina Creek – New Boat Ramp and Car Trailer Park
Projex Partners was engaged by Transport and Main Roads for the detailed design of a boat ramp, car trailer park and access road for a new boat ramp on Casuarina Creek, Port Alma. The work also included geotechnical design and...
Landsborough Park & Ride and Bus Station Re-Design
Detailed design and documentation of the proposed 300+ bay carpark, bus interchange and kiss and ride facilities for the Landsborough Park and Ride and Bus Station and associated Dyer Street upgrade and Tytherleigh Avenue / Caloundra...
Max Morton Staircase, Arana Hills
Projex Partners designed a pathway connection between Plucks Road to Minto Crescent, Arana Hills. The project provides an improved connectivity for pedestrians and cyclists heading north and south, and to provide a safer alternative to D...
Nulty Way Park Staircase, Arana Hills
Projex Partners designed the replacement stairs at Nulty Way Park connecting Plucks Road and Cobbity Crescent, Arana Hills. Precast concrete steps were used to reduce the impact on the surrounding environment and allow for a more...
Argyle – 44 Maxwell Street, New Farm
Projex Partners undertook the detailed design of the 5 storey premium apartments over 3 basements adjacent to the Brisbane River.The project consisted of two discrete construction stages designed to allow for the retention of a refurbish...
South Pine Road and Plucks Road, Arana Hills – Intersection Upgrade
Projex Partners were engaged to design and document the intersection priority change at Arana Hills. The upgrade of South Pine Road/Plucks Road intersection has provided improved road capacity and intersection performance, enhanced...
Cod Hole Boat Ramp & Car Park Upgrade, Maroochydore
Projex Partners undertook the design and documentation for the Cod Hole Boat Ramp car park upgrade, located on Bradman Avenue, providing access to the Maroochy River. This project delivered a design to widen the boat ramp car park to acc...
Thornside Road Floodways, Gympie
Projex Partners were engaged by Gympie Regional Council to undertake the design of two floodways that required replacement due to their deteriorating conditions. The floodways were located within mapped waterways and an ecological sensit...
Dorothy Anderson Park, Warana – Public Amenities Building
Projex Partners were commissioned by Sunshine Coast Council to provide detailed civil and structural design, approvals and documentation to facilitate construction of a new public amenities building at Dorothy Anderson Park, Wurtulla, as...
First Bay, Coolum
First Bay by Mosaic is a luxury beach front residential apartment building located in First Bay, Coolum. First Bay comprises of two separate buildings with 40 residential apartments with 2 levels of underground carparking....
Market Lane Residences, Maroochydore
Projex Partners were engaged for the Structural and Project Coordination components of this unique and landmark second project to be undertaken in the new Maroochydore City Centre. Market Lane is part of a two tower project, with 65 apar...
Alice and Fitzgerald Streets, Innisfail – Intersection Upgrade
Projex Partners were engaged by Cassowary Coast Regional Council to carry out detailed design & RPEQ certification and to produce bill of quantities and safety in design documentation for pedestrian and stormwater drainage upgrades at th...
Pettigrew Street Reserve Caboolture
Design and documentation of 4 drainage treatment upgrades located across the Moreton Bay Region. Pettigrew Street included the design and construction certification of a Ecosol Trash Rack and surrounding works including fencing and barriers....
Midge Point Boat Ramp
Midge Point boat ramp included the design of a boat ramp and causeway north of Mackay. The causeway and ramp are located within tidal land and the Great Barrier Reef Marine Park which required the location to be positioned to minimise im...
Cupania Street, Mudjimba
The detailed design adopted a curvelinear alignment to assist with traffic calming and to suit adjacent streets. Existing public utility services were thoroughly investigated to ensure conflicts were avoided. The stormwater drainage desi...
TAMS Project – Mine Entrance Roads and Carparking
Concept, Preliminary and Detailed Designs for new mine entrances for all BMA mine sites in Bowen Basin (12 Coal mines) Each mine entrance included a new Site Access Centre and electronic security access to record all personnel entering o...
Bellbird Park Secondary School Retaining Walls
Condition inspection and report of rock retaining walls at Bellbird Park Secondary School....
50ML Tanks
Measuring 145.2m in diameter and 3.0m deep, the tank is used to collect and treat saline water extracted as part of the mining process for safe re-release into the aquifer....
Downer EDI Contractors Yard at Daunia Coal Mine
Layout development and detailed design of new contractor’s yard at Daunia Coal Mine. This included the design of the following facilities: Haul truck, parking area, workshop, tyre shop, fueling station, wash bay, contractor’s...
Sunshine Cove Kayak Portage
Projex Partners was engaged by Sunshine Coast Council for a kayak portage strategy and design for access between Cornmeal Creek and the Sunshine Cove lake system....
D’Aguilar Highway, Caboolture
Detailed design for the widening of D’Aguilar Highway for the installation of 3.8km of wide centreline treatment (WCLT) and pavement rehabilitation works....
Brisbane Valley Highway Safety Enhancement Detail Design
Intersection upgrades and road side hazard improvements within a section of the 84km of the Brisbane Valley Highway between Fernvale and Harlin....
William Berry Drive, Morayfield – Road Rehabilitation and Dickson Road Intersection Upgrade
1km of pavement rehabilitation at the Morayfield Shopping Centre and intersection upgrade of William Berry Drive / Dickson Road....
Currimundi Lake Retirement Village, Stormwater Quality Improvement Device (SQID)
Projex Partners was engaged by Sunshine Coast Council to project manage the removal and replacement of trash screen and basket at the Currimundi Lake Retirement Village. Works were coordinated to be carried out during the replacement...
Fauna Crossing – New Settlement Road, Burpengary
Detailed design for the fauna crossings proposed on New Settlement Road, Burpengary....
Bruce Highway & Wide Bay Highway Intersections Options Assessment
Provision of an options analysis and Business Case for the at grade intersection safety and capacity upgrade of the Bruce Highway and Wide Bay Highway intersection....
Old Gympie Road, Dakabin – Corridor and Intersection Upgrade
Widening of 700m section of the road corridor to a 4-lane median divided carriageway, signalising the intersections at Hughes Road East / Dakabin Waste Facility access and Goodwin Rd / Watson Park....
Harris Avenue Sports Complex, Narangba
Concept planning, preliminary and detailed designs of 6 tennis courts, clubhouse and associated carpark....
Miscamble and Queen Street, Roma – Cycleway Intersection Upgrade
Miscamble & Queen Street cycleway intersection upgrade located 500m from Roma’s CBD....
Plucks/Minto Crescent, Arana Hills – Pathway Construction and Detailed Design
New 110m suspended walkway, including 5 stair flights due to the steep site topography (20m level difference). The pathway is required to cater for both pedestrians and cyclists through the use of ramped wheel tracks....
Hornibrook Esplanade, Clontarf – Segregated Cycle Pathway
525m new cycleway along Hornibrook Esplanade, Clontarf to create a high-quality separated cycling facility to safely separate pedestrians and high-speed groups of cyclists exiting the Hornibrook Bridge....
Young and Oakey Flat Road Intersection, Narangba
Projex Partners alongside Venant Solutions provided drainage design and flood modelling for Young and Oakey Flat Road Intersection, Narangba...
Bruce Highway South of Back Creek Range
Options Analysis and Detailed Design for the Wide Centre Line Treatment (WCLT) project for 2.4km of the Bruce Highway between Gin Gin and Benaraby.The project includes multiple overtaking lanes and intersections plus sections requiring...
Mooloolah River Dredging
Preparation of a tidal works application that supports the proposed maintenance dredging of the Mooloolah River between Mooloolah Island and Outrigger Park by Sunshine Coast Council....
National Storage, North Lakes
These self-storage units comprised two large buildings. The smaller 4000m2 floor space structure (incl. upper and lower floors)....
Emerald Court, Mapleton – Surface and Subsurface Drainage Design
Design, documentation, and civil construction certification of subsurface and surface drainage within Council’s reserve at Emerald Court, Mapleton....