Projex Partners was engaged by Sunshine Coast Council to project manage the removal and replacement of trash screen and basket at the Currimundi Lake Retirement Village. Works were coordinated to be carried out during the replacement of the Village deck area that needed replacement as it was severely corroded.
Project Categories: Project Management
Mary Valley Rattler Railway Restoration
Project management and Advisor to Superintendent (Gympie Regional Council) for the Mary Valley Rattler Railway Restoration Construction Contract.
This project was triggered as a disaster recovery project after large sections of the rail line between Mary Valley & Imbil was severely damaged. Sections of the track were displaced, completely undercut and damage had occurred to bridges. Projex Partners role provided Project management and administration of the contract and Supervision for the restoration works of 23 km of railway infrastructure including 15 timber bridges.
Kilkivan Equestrian Centre
Contract administration for the construction of the Kilkivan Equestrian Centre. Works involved the brief for the design and tender documentation., tender review and assessment.
Lockhart River Bridge Replacement
Projex Partners in conjunction with Black & More, undertook the detailed design and documentation of the replacement of an existing degraded bridge in Lockhart River in Cape York with a major culvert structure.
The site is on the only access to the Lockhart River airstrip and management of accessibility to the airstrip was a key consideration in the design.
NDRRA Queensland Reconstruction Authority
Projex Partners was engaged by Sunshine Coast Council to undertake the Project Management for Browns Road floodway and culvert restoration under the Natural Disaster Relief and Recovery Arrangements (NDRRA).
NDRRA site inspections, scoping, reporting and preparation of NDRRA submissions for Sunshine Coast Regional Council of sites in Peachester, Beerwah, Glenview, Pelican Waters, Landsborough, Beerburrm, Glass House Mountains, Yandina, Nambour, Palmwoods, Eumundi, Belli Park, Coolabine, Kiamba, Meridan Plains, Tanawah, Woombye, Mooloolah Valley, Gheerulla, Eerwah Vale, Dulong, Federal, Pomona, Cooroy, Lake MacDonald, Bald Knob, Maroochy River, Doonan, Reesville, Buderim, Mount Mellum, Balmoral Ridge, Cootharaba, Hunchy, Bli Bli, Coolum, Obi Obi, Weyba Downs, Sunshine Beach, Conondale and Little Mountain.
Queens Street Upgrade
Project management for Queens Street Upgrade project at Caloundra involving duplication to 4 lanes and a grade separated interchange connection to Nicklin Way and other at grade signalised intersection upgrades.
Sunshine Coast Industrial Park Stage 1
Development manager for the planning, design and construction of 73 industrial allotments over 100 hectares at Caloundra.
Project value: $61.5 Million
Nandroya Industrial Estate
Development Manager for the decontamination planning, design and construction for 11 industrial allotments over 10 hectares at Cooroy.
Project value: $5.3 Million
Willowbank Industrial Precinct
Development adviser for the planning of industrial development over 600 hectares at Willowbank in the Western Corridor.
Narangba Industrial Estate Common Infrastructure Project
Development manager and design director for the planning and design for construction of common fire water runoff management infrastructure at the Narangba Special Industry Estate.