Bruce Highway South of Back Creek Range

Options Analysis and Detailed Design for the Wide Centre Line Treatment (WCLT) project for 2.4km of the Bruce Highway between Gin Gin and Benaraby.

The project includes multiple overtaking lanes and intersections plus sections requiring extended design domain assessment.

Mooloolah River Dredging

Preparation of a tidal works application that supports the proposed maintenance dredging of the Mooloolah River between Mooloolah Island and Outrigger Park by Sunshine Coast Council.

National Storage, North Lakes

These self-storage units comprised two large buildings. The smaller 4000m2 floor space structure (incl. upper and lower floors).

Jessica Park Pond Remediation, Kawana

Investigation and design of the existing pond function including remediation, to improve playing area within the park, improve water quality and a reduced ongoing maintenance costs to Sunshine Coast Council for pond maintenance.